A little more progress.
Got another pair of Cerianis repainted, ready to reassemble with new seals and oil now.
Got another pair of Cerianis repainted, ready to reassemble with new seals and oil now.
Then I got busy starting to strip down a Jota that has a sick engine. All the prep work done today removing all the necessary fasteners, cables, hoses etc. Should get the engine out on Sunday when I get help to lift it out.
Also tried out a new pair of hand grips on my own bike. The left one was easiest to swap so I did that first. The right one needs some disassembly of switches and throttle cable mount so will do that when I get time. Very pleased with feel and softness of the left one though, Ha ha, sounds like a shit paper advert!