This morning I collected some newly painted parts.
I quickly fitted the engine in the frame, a 10 second job single handed. I have it sussed and I don't need to wrap the frame in protective materials. I also fitted a new steering lock.
I can't fit the wheels yet as I am still waiting on steering head bearings and swing arm bearings, but at least I can progress with the wiring.
I also collected some bodywork. The sidepanels and tailpiece were ready, but the tank will need some more time as the stripes still need to be applied.
So, I fitted the badges to the sidepanels and will collect the tank later.
It's a lovely candy red colour that really comes alive when it's in the sunshine.
I also collected some bodywork. The sidepanels and tailpiece were ready, but the tank will need some more time as the stripes still need to be applied.
So, I fitted the badges to the sidepanels and will collect the tank later.
It's a lovely candy red colour that really comes alive when it's in the sunshine.